Today I want to discuss seven common mistakespeople build when remodeling their lavatory, and no. 7 is something I ensure all the time.So watch perfectly, and make sure you dont conclude these mistakes.So the no. 1 mistake is not shutting off the irrigate to your shower before demoing anythingin the shower, including removing a lavatory or removing a pride. You never are well aware oldthe valves are that youre going to be shutting off, and a lot of periods they end up leakingjust by turning them.So I always shut off the water before I start any demo in the bathroom.Now, you wonder: What do you do if you do have a revealing faucet or a leaking valve? What can you do to quickly remedy that so that you can continue remodeling the bathroomand get the water turned on for the rest of the dwelling? SharkBites are a great option.A slipon type of pushon fitting truly streamlines things and constructs it a lot faster to move onwith your project.The second mistake that I investigate very commonis not having your ornaments, after you tear out the lavatory and in preparations for your brand-new showerand bathtub encircle, is to having your framing 16 inches on centre even with one another.And thats super important. You dont want to be putting a patron board up thatsgoing to have a bow in it. It compiles it that much more difficult to actually tile thatsurface. So making sure that theyre even and plainly plumb. Plumb would make it easierto install shower openings. Itll make it easier for all the tile layout in process. So makesure that you have your ornaments 16 inches on hub and that everyone is ornaments are even with oneanother. The third biggest mistake is not having aclean and sound subfloor before installing a brand-new shower system or tile floor. Too manytimes I recognize parties trying to go over existing vinyl floors where they peel off the vinylfloor there are still all this glue thats still on the subfloor, and even more severe, aroundthe lavatory field where the subfloor might be dampened by water shattering. You want to makesure you have a solid foundation for your tile and your shower, or tub structure for thatmatter.You want to make sure that mainly that “youve had” joists that are 16 inches oncenter and that you have a minimum of a inch thick plywood layer.Okay, so the fourth one I determine generally is when youre installing a brand-new shower or atub smother, trying to keep the old-fashioned valve that was existing there. Some people thinkthat its very difficult to replace; it costs too much money. Youll end up havingproblems with it, really threw it that way. You will have problems with that old-fashioned valve. Mostlikely youre remodeling your lavatory because its previously 15 years old. Dont leavethe existing valve in. Made to ensure that you adjusted it to the correct depth and youre preppedfor the brand-new shower. Number five big common problem is just usingcementitious ally cards or HardieBacker and not waterproofing it. Those two itemsare not waterproof.They need to be sealed with a liquid sheath or a expanse membraneof some sort. So always have a waterproof tub encircle or waterproof shower before youbeing to tile. Number six is in the tiling installing portionnotmixing your thinset to the proper water ratio of that manufacturers definitions. Youalways want to make sure that “youre reading” the back of the bag of the thinset that youreusing and use the right amount of water for the amount of thinset. Some of my favoritethinsets are made by Ardex.They actually can allow you to mix smaller parts ofthe pulverize and water assortment rate. For speciman, one of my favourites is X 77. You can use twopartspowder and onepart water, and its at the right rate. Too often I recognize tile failureswhere none of the thinset is actually at the back of the tile, and a good deal of thats becausethe combination was too dry. So you always want to make sure that you use the proper extent ofwater when mixing thinset. So, and finally number seven, the worst mistakethat I naturally see in a lot of beautiful showers that mightve been simply built ayear ago is examining mastic used as the adhesive for the tile. Mastic, the stuff that comesin a pail thats premixed, is not concluded for soaked expanses. Its not concluded for showersor tub environments or shower floors.Its an organic matter. It will mold. So if yousee mold coming through your grout cables, chances are somebody mightve applied masticbehind that tile and developed that trouble. So please do not use a premixed mastic foryour shower. So you only want to use a thinset, somethingthat you mingle ocean with. Modified thinset is usually elevated for most of these newporcelain tiles. You want to use directional troweling, and you want to make sure thatyoure getting a 95% bond to your tile in a soaked expanse. The coverage is really going tobe trial and error. I make frequently its applying the claim trowel length and using directionaltroweling so that you can achieve that coverage. Its ever a good notion on the first tile, pull it off, make sure that you look at the back of the tile, make sure its gettinga good bond. And then you can feel confident about remodeling or continuing with the tilethroughout the rest of the bathroom.If these tips-off help me out here out, please giveus a thumbs up. Leave us a comment below if you have any questions about any of your bathroomquestions, anything that you might be involved in remodeling. Were now to help you out.So leave us a comment below. Thanks !.